The Challenge
Dimartech was contacted by a leading supplier of industrial equipment for air-pollution control and process-gas treatment. Their request: to simultaneously build 2 large Venturi scrubbers, measuring 11 ft in diameter by 40 ft in length.
The challenge in this project was not only the size and precision of the equipment, but also the short-term delivery time. The scrubbers were to be delivered in five months.
The Solution
As with all projects dealing with particulate removal from gas streams, precision was one of the key factors.
The project was successfully completed on schedule and within budget thanks to Dimartech’s advanced skills in:
- High-quality welding
- Dimensional accuracy.
Read about our products and service for the petrochemical
industry.